Pembangunan PLTD Desa Pulau Terluar

With an installed generator capacity of 100 kW, an available power of 85 kW, and a peak load of 67 kW, along with a Medium Voltage Network (JTM) span of 2.3 km (circuit kilometers), a Low Voltage Network (JTR) span of 3.65 km, and a total installed substation capacity of 300 kVA, electricity from PLN can now be enjoyed by approximately 200 households

  • Category

    Energy

  • Client Name

    Perusahaan Listrik Negara (PLN)

  • Start Date

    19 Nov, 2021

  • End Date

    09 Feb, 2021